Documents/iECM/3: Scope/3.1: New Scope

3.1: New Scope

Determine the new scope beyond interconnectivity

Other Information:

* Beyond the CMIS scope of interconnectivity * The full scope of development and operation of interoperable systems which include but are Not limited to Content Management (i.e. unstructured and semi-structured data)

Indicator(s):