2: SAC Role
Energizing the Commission’s SACs by enhancing their institutional role in program planning and increasing their productivity. Other Information:
Performance Measures: 2(a). Obtain input from SACs as a part of the program planning cycle annually by October 31st. 2(b).
Conduct a joint national office and SAC project every two years (i.e., biennially) and issue a report within 12 to 18 months
following initiation of each project. 2(c). Solicit SAC ideas for SAC follow-up activities on Commission (national office)
projects at the regional, state, and local levels annually during October.
Indicator(s):
|