![]() |
| Home | Statistics | Documents | Catalog | StratEdit | XSLTForms | DNAOS | About | Portal | Glossary | Contact [!?] |
| Documents/DOI/2: Resource Use/1: Responsible Development and Use |
1: Responsible Development and Use Manage or Influence Resource Use to Enhance Public Benefit, Responsible Development, and Economic Value Other Information: End Outcome Performance Measures: Provide for access:[1]Percent of fluid mineral leases with approved applications for permits to drill [BLM] [FY2012: 47%] [2]Number of onshore Federal acres under lease for coal development. [BLM] [FY2012:464,250] [3]Number of offshore lease sales held consistent with the Secretary's 2007-2012 Five-Year Program [MMS] [FY2012: [FY2012: 4] Responsible Development:[4]Average acreage disturbed per permitted energy exploration or development activity [BLM] [FY2012: 2.1] Coal: - [5]Percent of active coal mining sites that are free of off-site impacts [OSM] [FY2012: 93%] - [6]Percent of mined acreage reclaimed. [OSM] [FY2012: 45%]Fluid Minerals: - [7]Number of acres reclaimed to appropriate final land condition [BLM] [FY2012: TBD] Appropriate Value:[8]Percent of Federal and Indian revenues disbursed on a timely basis per statute. [MMS] [FY2012: 99%] Provide for Access: [9]Number of megawatts of installed capacity authorized on public land for renewable energy development [BLM] [FY2012: TBD] Responsible Development [10]Percent of wind farms incorporating best management practices for protecting raptors and other birds and bats [BLM] [FY2012: 80%] Provide for Access: [11]Number of megawatts of hydropower delivered annually [BOR] [FY2012: 12,362] Responsible Development: [12]Percent of time in forced outage [BOR] [FY2012: 2%] Appropriate Value: [13]Percent of base Operation and Maintenance cost for power compared to the 5-year rolling average cost, expressed as $/MW [BOR] [FY2012: 7.21%] Energy (Fossil Fuels) Intermediate Outcomes and Performance Measures: 1: Effectively Manage and Provide for Efficient Access and Development [14]Percent of fluid mineral permit and lease applications processed. [BLM] [FY2012: 94%][15]Percent of coal permit and lease application processed. [BLM] [FY2012: 100%][16]Percent of available offshore oil and gas resources offered for leasing compared to what was planned in the Secretary's Five-Year Plan [MMS] [FY2012: 94%][17]Develop a commercial oil shale leasing program by FY 2008 [BLM] [FY2012: N/A][18]Percent of pending cases of rights-of-way permits and grant applications in backlog status [BLM] [FY2012: 25%] 2: Enhance Responsible Use Management Practices[19]Oil Spills: Amount (in barrels) of offshore oil spilled per million barrels produced [MMS] [FY2012: 5][20]Percent of required fluid minerals inspection and enforcement reviews completed [BLM] [FY2012:85%][21]Percent of required coal inspection and enforcement reviews completed [BLM] [FY2012: 95%][22]Composite accident severity ratio [MMS] [FY2012: 0.05][23]Percent of fluid mineral safety violations (incidents of non-compliance) corrected by operators with first notice [BLM] [FY2012: 97%] Appropriate Value Through Effective Lease and Permit Management [24]Percent of late disbursements [MMS] [FY2012: 1%][25]Percent of Federal and Indian royalties compliance work completed within the 3-year compliance cycle [MMS] [FY2012: TBD][26]Net return (in dollars) to the government through royalties-in-kind (RIK) [MMS] [FY2012: TBD] Energy (Hydropower) Intermediate Outcomes and Performance Measures: 1: Operate and Maintain Reliable, Safe, and Secure Power Facilities [27]Facilities Reliability: Hydropower facilities are in fair to good condition as measured by the Facilities Reliability Rating. [BOR] [FY2012: 95%] 2: Improve Power Generation Management to Maximize Supply[28]Percent of time that Bureau of Reclamation hydroelectric generating units are available to the interconnected Western electrical system during daily peak summer demand periods. [BOR] [FY2012: 92%] 3: Address Environmental / Resource Stewardship Concerns [29]Percent of environmental audit findings and reviews addressed {results pertain to both water and hydropower facilities} [BOR] [FY2012: 75%] Indicator(s):
|
| sitemap | Copyright 1971-2012 01 COMMUNICATIONS INC. ALL RIGHTS RESERVED. - Powered by DNAOS | contact |