![]() |
| Home | Statistics | Documents | Catalog | StratEdit | XSLTForms | DNAOS | About | Portal | Glossary | Contact [!?] |
| Documents/DOIIT/5: IT Infrastructure/6: ESN |
|
Complete the transition of ESN to the GSA Networx contract; Migrate core ESN to IPv6; Ensure ESN is available for users at least 99.1% of the time; and Complete full operational capability for ESN test lab. (FY08 – FY12) Indicator(s):
|
| sitemap | Copyright 1971-2012 01 COMMUNICATIONS INC. ALL RIGHTS RESERVED. - Powered by DNAOS | contact |